Contracting Process Redesign
Regenstrief Contracting Process Redesign
What's actually happening today, where it's headed, and what needs to change.
Prepared for the contracting redesign team · August 2026
Slide 2
How to Read This
Same spirit as everything else this project has produced.
- This is a strawman, like every other document in this project. It is meant to be picked apart and corrected, not approved as written.
- Two threads run through it: what is changing in the process itself, and what is changing in the tools and governance behind it.
- A lot of what follows comes from live working sessions with the pre-award and post-award team leads, plus five customer interviews. Some of it will be new even to people who have lived this process for years, because it is the first time it has all been written down in one place.
- Nothing here commits budget or headcount. The goal is to align on direction before we scope initiatives in more detail.
Slide 3
The Grant & Contract Lifecycle
The full path a grant or contract travels, phase by phase, with who owns each one today. This is the process this project is redesigning.
1
Opportunity Identification & Eligibility
Owner: Pre-Award
Identify and share funding opportunities; confirm eligibility to submit under a given opportunity's criteria.
Science, Contracting
2
Proposal Development & Budget
Owner: Pre-Award & Science
Science drafts the narrative and specific aims; Pre-Award builds the budget, obtains vendor quotes, and coordinates faculty effort agreements.
Post-Award, on complex proposals
3
Submission & Sponsor Review
Owner: Pre-Award
Assemble and submit the package; watch for sponsor status changes; respond to sponsor requests for updated information after review but before a funding decision.
Post-Award
4
Award Document Execution
Owner: Pre-Award (simple) or Contracting (complex / industry)
Review and execute the revenue document; run debarment and suspension screening.
Pre-Award, Post-Award
5
Award Setup & Handoff
Owner: Pre-Award → Post-Award
Hold the award kickoff/handoff meeting; set up the extramural project in Financial Edge.
General Ledger (GL) team
6
Active Award Administration
Owner: Post-Award
Approve monthly effort and expenses; coordinate procurement; notify the sponsor of key personnel or scope changes; maintain Financial Edge records.
Science, GL
7
Invoicing & Financial Compliance
Owner: GL team
Generate invoices; post journal entries; apply Facilities & Administrative (indirect cost) and fringe rates; pursue aged receivables.
Post-Award approves each invoice
8
Scientific & Programmatic Activity (runs in parallel, ongoing)
Owner: Science
Attend project meetings; complete scientific reporting requirements; review subrecipient technical and progress reports.
Post-Award
9
Continuation, Amendments & Supplemental Funding
Owner: Post-Award (simple) or Contracting (complex / industry)
Process amendments, no-cost extensions, and supplemental-funding requests.
Pre-Award, GL, Science
10
Closeout & Audit
Owner: Post-Award & GL
Flag the project for closure; reconcile the balance; complete closeout forms and sign-offs; respond to any required audit.
Contracting, Science
GL = General Ledger team. Financial Edge is Regenstrief's fund-accounting system. Phases 1 through 4 sit with Pre-Award; phases 5 through 10 sit with Post-Award and GL, with Science running alongside throughout.
Slide 4
Where the Pain Points Live
The same ten phases from the lifecycle map, this time showing what's actually broken in each one. 46 pain points were coded from customer interviews and checked against current practice.
1
Opportunity ID & Eligibility
Ambiguous entry point: multiple ways to start, no single front door, especially for industry-partner work. Workload is balanced through an unofficial, personally-built scoring tool, not a documented standard.
Partial
2
Proposal Development & Budget
No low-stakes way to rough out numbers before the official budget process starts. A separate budget-related form duplicates work already captured in the main intake form. Indirect-rate and salary data in reused old budgets goes stale, the real source of the calculation errors long attributed to invoicing. Vendor and subcontract scoping isn't reliably happening before submission, and faculty effort agreements with IU ORA aren't being coordinated here despite being assigned to this phase.
Not Addressed
3
Submission & Sponsor Review
No requester-facing tracking once a proposal is submitted; staff and requesters both build their own shadow trackers. A sponsor request can resurface a proposal presumed dead over a year later, with no shared record of the original rationale.
Not Addressed
4
Award Document Execution
A single reviewer handles essentially all contract review, a real bottleneck right now, not a hypothetical one. No unified way to check whether an agreement with a given partner already exists.
Partial
5
Award Setup & Handoff
No formal handoff meeting exists in practice; a standing biweekly meeting covers it informally. Budgets don't reliably travel with the award into post-award's hands, and pre-award isn't told in advance what information post-award will need down the line.
Partial
6
Active Award Administration
Administrative and coordination tasks, scheduling, follow-ups, documentation, have no default owner across Pre-Award, Post-Award, and Contracting, so they fall to whichever Science team member is willing to chase them. No dashboard or shared visibility into an active award's status either.
Planned
7
Invoicing & Financial Compliance
The monthly invoicing update is often delayed and not always clearly announced. What used to be described as invoicing errors traces back to stale rate and salary data in reused budgets, see Phase 2.
Not Addressed
8
Scientific & Programmatic Activity
Investigators report needing to act as scientist, project manager, and contracting expert all at once, more roles than one person should carry, sharpest in industry-partner work.
Planned
9
Continuation, Amendments & Supplemental Funding
A recent reassignment of simple continuing-award contracting was decided above both teams, not agreed between them, and is still a live source of friction. Proposed contract changes are often exchanged by email, outside the tracking system.
Not Addressed
10
Closeout & Audit
Renewal dates and other obligations are tracked by hand: someone opens the signed PDF, finds the date, and does the math themselves. Nothing links related agreements together for reporting.
Not Addressed
A few issues showed up in several phases at once rather than just one; the next slide names those first, then the following ten slides go one phase deeper at a time.
Slide 5
Issues That Cut Across Every Phase
These aren't confined to one part of the lifecycle. Keep them in mind heading into the phase-by-phase review that follows, they account for a lot of what gets marked Not Addressed or Partial there.
No default owner for administrative work. Scheduling, documentation, and following up on outstanding items aren't the science itself, that stays with Science, but nothing assigns this work to Pre-Award, Post-Award, or Contracting either, so it defaults to whichever Science team member is willing to chase it. Sharpest during active award administration (Phase 6), but also shows up at handoff (Phase 5) and in scientific and programmatic activity (Phase 8). Proposed fix: Administrative Task Ownership & Tracking, Slide 26.
No shared status visibility. Nobody outside the person handling a request can see where it stands. Pre-award and post-award have each independently built their own personal tracking spreadsheets to cope, and requesters do the same. Touches nearly every phase, sharpest at submission (Phase 3) and during active award administration (Phase 6). Proposed fix: Shared Status Dashboard, Slide 26.
No defined turnaround-time expectations. Nothing tells a requester or stakeholder what a normal wait looks like, so silence reads as a problem and last-minute questions pile up right before a deadline instead of surfacing early. Shows up at submission (Phase 3), during active award administration (Phase 6), and in invoicing (Phase 7). Proposed fix: Turnaround-Time Expectations, Slide 26.
No single source of truth for documents and data. Contracts, budgets, and obligations live wherever the person handling them happened to save them, a shared drive, an individual desktop, a personal inbox. Shows up in award document execution (Phase 4), at handoff (Phase 5), and in closeout and audit (Phase 10). Proposed fix: Storage & Source of Truth, Slide 26.
Slide 6
Partial
Phase 1: Opportunity Identification & Eligibility
Where a request enters the process, and who owns getting proposals staffed.
No single front door. Investigators and program teams have used a personal inbox, a shared inbox, or the industry-partnership team, depending on who they happened to ask, with a different experience down each path.
Workload is balanced through a personal tool, not a documented standard. A staff-built scoring system rates each proposal's complexity (sub-only vs. prime-plus-sub vs. multiple subs) and feeds a workload total per person. It works, but it would not transfer to a new hire.
Coordination with the industry-partnership team is a confirmed gap, acknowledged on both sides, not yet resolved.
Whether a PI has multiple submissions out at once isn't tracked anywhere in pre-award. It's treated as a downstream, post-award concern instead.
Slide 7
Not Addressed
Phase 2: Proposal Development & Budget
Where the narrative and budget actually get built.
No low-stakes way to rough out numbers before the official budget process starts. Program staff have been told not to informally play with percentages at all, even just to sanity-check a figure.
Budget calculation errors happen, and there's no documented quality check. One historical near-miss: unconsulted market-rate salary increases nearly bankrupted grants years ago. What gets described elsewhere as an invoicing problem, staff afraid to touch the indirect-rate spreadsheet, actually starts here: reused old budgets carry forward stale salary and indirect-cost rate data. The fix needs to be a real second-reviewer check, not just better tools.
Budget version confusion. Multiple drafts of the same budget circulate by email with no agreed final version, so people end up asking "wait, are we using that one?"
A separate budget-related (RDS) form duplicates work already captured in the main request. RDS functions as an internal vendor here, the fix is treating it like any other vendor quote request, not a data-reconciliation problem.
Fair-market-value budgeting for industry-funded work isn't well understood outside Finance. The calculation itself is correctly owned by a small group in Finance, a private-funder compliance requirement, not an ownership gap. The real risk is upstream: staff quoting a number to a private funder without first working through assumptions with Finance, so the number can't be backed up later.
Vendor and subcontract scoping isn't reliably happening in pre-award before submission. Awards land with subcontracts or vendor agreements the proposal never scoped, so Contracting is scrambling to identify scope of work and vendors after the fact, and the existing vendor assessment tool isn't being used. Not a workload issue to route around: if it's happening because of volume, that's a staffing conversation, not a reason to skip the step.
Faculty effort agreements with IU ORA aren't being coordinated in pre-award, despite that being assigned here. It's landing on post-award instead, after the award is already in place, too late to do properly.
Slide 8
Not Addressed
Phase 3: Submission & Sponsor Review
Once a proposal is out the door, until an award decision comes back.
A sponsor request for updated information can resurface a proposal presumed dead over a year after submission, with no shared record of why it was written the way it was. Two live examples exist right now.
Status monitoring is opportunistic, not active. Sponsor communication about a proposal usually reaches the investigator first, so pre-award often learns of changes only by asking.
Slide 9
Partial
Phase 4: Award Document Execution
Reviewing and executing the actual award document.
A single reviewer handles essentially all contract review. That is a real, current bottleneck, not a hypothetical one, and coverage has already been tested by one extended absence.
No unified way exists to check whether an agreement with a given partner already exists, though an inventory does exist. It was built and tracked previously; it just was never communicated to the rest of the org. The fix is socializing what's already there, not building a new list from scratch.
Debarment and suspension screening, and the independent-contractor check, both currently happen after this step, once the award has already landed. This is an organizational government-compliance requirement, not an HR process, mainly relevant when subcontractors or vendors are involved, and it's run through Contracting and Payables. The timing is being questioned: shouldn't RI confirm a named vendor is workable before including them in a proposal, rather than after?
Slide 10
Partial
Phase 5: Award Setup & Handoff
Getting a newly awarded project properly set up and handed to the team that runs it day to day.
No formal handoff meeting exists in practice. A standing biweekly meeting between the two teams covers it informally instead.
Budgets don't reliably travel with the award. Sometimes the file isn't in the expected shared-drive location; sometimes it's sitting on an individual's desktop.
Vendor documentation can be missing at handoff. Projects routed through an internal service unit have reached the next team with only a verbal budget number, no draft agreement, quote, or the vendor's correct legal name.
Pre-award isn't told in advance what post-award will eventually need. Things that would take five minutes to capture during proposal development, but are much harder to reconstruct a year later, get missed because pre-award has no visibility into post-award's downstream information needs.
Slide 11
Planned
Phase 6: Active Award Administration
The ongoing, monthly work of running an award once it's active. Most of this phase's pain is systemic rather than unique to it, see Slide 5.
Ad hoc, cross-team requests that fall outside the well-defined recurring tasks (an unusual data pull, for example) land on whoever happens to be available, not a defined owner.
Slide 12
Not Addressed
Phase 7: Invoicing & Financial Compliance
Generating and reconciling invoices against each award's terms.
The monthly invoicing update is often delayed, especially when a contract isn't fully set up yet, and it isn't always clear when an update has happened.
What's shown up here as indirect-rate calculation errors actually originates upstream, in budget-building, see Phase 2. Reused old budgets carry forward stale salary and rate data. Invoicing needs a backstop quality check regardless, but the root fix lives earlier in the process.
Slide 13
Planned
Phase 8: Scientific & Programmatic Activity
The research and reporting work that runs alongside every other phase, not after them.
Investigators describe needing to act as scientist, project manager, and contracting expert all at once, more roles than one person should have to carry.
This is sharpest in industry-partner work, which is newer territory for most teams and far less supported today than standard federal-grant work.
Slide 14
Not Addressed
Phase 9: Continuation, Amendments & Supplemental Funding
Extending, amending, or adding funding to an award already in progress.
A recent reassignment of simple continuing-award work to a different team was decided above both teams, not agreed between them, and pre-award has pushed back on it more than once.
Whether the underlying responsibility matrix is a final decision or still a working draft has never been resolved, despite being raised three separate times.
Proposed contract changes are often exchanged by email outside the tracking system, with no shared way to see which version is current.
Slide 15
Not Addressed
Phase 10: Closeout & Audit
Wrapping up a completed award, and keeping track of what it still obligates RI to do.
Renewal dates and other obligations are tracked by hand: someone opens the signed PDF, finds the date, and manually calculates a deadline. It's easy to misread a date or simply forget.
Nothing links related agreements together for reporting. Executing an award doesn't automatically flag a related vendor agreement or lease named in the same proposal, though the deeper cause traces back to vendor and subcontract scoping not happening during proposal development, see Phase 2.
Portfolio-level reporting, such as what's up for renewal next quarter, is only as reliable as whatever's been typed into a spreadsheet by hand.
Slide 16
The Grant & Contract Lifecycle: Future State
Same ten phases as Slide 3, same owners in almost every case. What changes is the tooling and process support underneath each one.
1
Opportunity Identification & Eligibility
Owner: Pre-Award
The industry-partnership team is enabled with clear guidelines and guardrails to work independently within what's appropriate for Regenstrief, instead of relying on an informal, meeting-by-meeting relationship. Workload balanced through a shared institutional tool instead of a personal spreadsheet.
Science, Contracting, industry-partnership team
2
Proposal Development & Budget
Owner: Pre-Award & Science
An explicit quality check catches calculation errors before a budget moves forward. The duplicate budget-related form is reconciled with the main request instead of requiring the same numbers twice.
Post-Award, on complex proposals
3
Submission & Sponsor Review
Owner: Pre-Award
A shared status dashboard replaces shadow spreadsheets, visible to requesters and Post-Award both. Published turnaround-time expectations replace ad hoc silence.
Post-Award
4
Award Document Execution
Owner: Pre-Award (simple) or Contracting (complex / industry), plus a second trained reviewer
Checked against a published agreement lookup list before assuming a new one is needed. Debarment and suspension screening moves earlier, to before submission, pending the group's decision on timing.
Pre-Award, Post-Award
5
Award Setup & Handoff
Owner: Pre-Award → Post-Award
Follows a published responsibility document instead of informal practice. Vendor documentation has a default owner, so it doesn't arrive at handoff incomplete.
GL
6
Active Award Administration
Owner: Post-Award
A default owner exists for ad hoc cross-team requests instead of "whoever's available." Shared status visibility replaces personal tracking.
Science, GL
7
Invoicing & Financial Compliance
Owner: GL team
An explicit quality check catches indirect-rate errors before they reach a sponsor. Published turnaround expectations replace unannounced delays.
Post-Award approves each invoice
8
Scientific & Programmatic Activity (runs in parallel, ongoing)
Owner: Science
Investigator education reduces how often Science ends up filling a contracting-expert role it wasn't meant to carry. Administrative tasks default to Pre-Award, Post-Award, or Contracting instead of landing here by omission.
Post-Award
9
Continuation, Amendments & Supplemental Funding
Owner: Post-Award (simple) or Contracting (complex / industry), pending the matrix being finalized
Proposed contract changes are tracked inside Issuetrak instead of email, so version history isn't lost.
Pre-Award, GL, Science
10
Closeout & Audit
Owner: Post-Award & GL
Renewal dates and obligations track automatically instead of by hand. Related agreements are linked so a lease or vendor deal named in the same proposal doesn't get missed.
Contracting, Science
Green marks the future state throughout this deck. Almost nothing here changes who owns a phase, what changes is the tooling and process support underneath it, largely the initiatives on Slide 26. Phases 4 and 9 assume open decisions get resolved, see Slide 27. The next seven slides break each phase down task by task.
Slide 17
Phases 1-2: Getting a Proposal Ready
Task by task, what each phase involves going forward. Same, Changed, or New marks what's different from today.
1Opportunity Identification & Eligibility
Pre-Award finds and vets funding opportunities before a proposal exists.
Identify & share funding opportunities. Pre-Award sources and shares opportunities with faculty.
Same
Enable the industry-partnership team with clear guidelines on broad-based opportunities. Clear guardrails so they can move independently, instead of an ad hoc, meeting-heavy relationship.
Changed
Confirm eligibility to submit. An eligibility/qualification check, not a mission-fit review.
Same
Balance PRA workload across staff. Runs on a shared institutional tool instead of one person's personal spreadsheet.
Changed
2Proposal Development & Budget
Science and Pre-Award build the narrative, budget, and supporting pieces of the package.
Draft narrative & specific aims. Science-owned, Pre-Award consulted.
Same
Obtain vendor quotes & draft non-binding SOWs, including subcontract and vendor scoping. Pre-Award, with Science feedback. Not happening consistently today, this is a real change, not a continuation of current practice.
Changed
Draft the budget. Same ownership, now backed by a mandatory second-reviewer check in Finance, not just better tools, catching both calculation errors and stale rate/salary data carried forward from reused budgets.
Changed
Coordinate faculty effort agreements with IU ORA. Assigned here, but not actually happening today, it's landing on post-award instead, too late to do properly.
Changed
Offer a low-stakes way to rough out ballpark numbers early. A guided estimator, not the official budget-drafting process, kept current so it doesn't become another stale spreadsheet. Finance is already piloting a three-tier version with documented assumptions; this is a lower priority than the other items on this slide.
New
Get a quote from RDS like any other internal vendor. RDS is treated as a vendor relationship, not a form-reconciliation problem, so the same numbers stop needing to be entered twice.
New
Document investigator sign-off on residual/margin split. Industry and fixed-dollar awards only.
Same
Slide 18
Phases 3-4: Getting to a Signed Award
Task by task, what each phase involves going forward. Same, Changed, or New marks what's different from today.
3Submission & Sponsor Review
The package is out the door; Pre-Award waits on, and chases, a funding decision.
Assemble & submit the sponsor package.
Same
Monitor for sponsor status changes. A shared status dashboard replaces shadow spreadsheets and opportunistic check-ins.
Changed
Respond to sponsor requests for updated information. Still Pre-Award-led; needs to be enhanced by better documentation practices so the original rationale isn't lost.
Same
Publish expected turnaround times. Requesters know what a normal wait looks like instead of reading silence as a problem.
New
4Award Document Execution
The award document itself gets reviewed, checked, and executed.
Review & execute the revenue document. Backed by a second trained reviewer, not a single point of failure.
Changed
Check whether an agreement with this partner already exists. An inventory already exists, it just hasn't been communicated. Publishing it answers this before assuming a new document is needed.
New
Run debarment & suspension screening. An organizational government-compliance requirement, not an HR process, mainly relevant for vendors and subcontractors. Proposed to move earlier, to before submission, pending the group's decision on timing.
Changed
Slide 19
Phase 5: Award Setup & Handoff
The pivot point of the whole process: where Pre-Award's work ends and Post-Award's begins.
5Award Setup & Handoff
Getting a newly awarded project properly set up and handed to the team that runs it day to day.
Hold the award kickoff/handoff meeting. Follows a published responsibility document instead of informal practice, and explicitly names who's the project manager, or, if there isn't one, makes clear the PI is taking on that role and owns their own timeline. Grants & Contracts supplies deadlines; it doesn't chase them.
Changed
Set up the extramural project in Financial Edge.
Same
Gather vendor documentation before handoff. Has a default owner, so it doesn't arrive incomplete.
New
Flag downstream information needs to pre-award before they're needed. Post-award tells pre-award what to capture up front, instead of reconstructing it a year later.
New
Slide 20
Phase 6: Active Award Administration
The ongoing, monthly work of running an award once it's active, where the cross-cutting issues concentrated most.
6Active Award Administration
Approve monthly effort allocation.
Same
Approve project expenses for posting.
Same
Coordinate procurement for items not named in the award.
Same
Notify the sponsor of key personnel or scope changes.
Same
Maintain Financial Edge active-project records.
Same
Handle ad hoc, cross-team requests. Has a default owner instead of landing on whoever's available.
Changed
Track status transparently. A shared dashboard replaces personal tracking.
New
Slide 21
Phase 7: Invoicing & Financial Compliance
Generating and reconciling invoices against each award's terms, mostly GL-owned work.
7Invoicing & Financial Compliance
Generate & send invoices.
Same
Approve each invoice. Post-Award, against award terms and balance.
Same
Post journal entries & cost-transfer corrections.
Same
Apply F&A and fringe rates. A backstop quality check catches indirect-rate errors before they reach a sponsor, though the root fix is upstream, at budget-building, see Phase 2.
Changed
Draw Payment Management System funds; pursue aged receivables.
Same
Publish an expected update cadence. Requesters aren't left guessing when the monthly update lands.
New
Slide 22
Phase 8: Scientific & Programmatic Activity
The research and reporting work that runs alongside every other phase, not after them.
8Scientific & Programmatic Activity
Attend project meetings.
Same
Complete scientific reporting requirements.
Same
Review subrecipient technical/progress reports.
Same
Ensure sponsor acknowledgment in publications.
Same
Absorb administrative coordination work by default. Ends: this work now defaults to Pre-Award, Post-Award, or Contracting instead of landing here by omission.
Changed
Carry contracting-adjacent judgment alone. Investigator education reduces how often Science fills a role it wasn't meant to carry.
Changed
Slide 23
Phases 9-10: Amending, Extending, and Closing Out
Task by task, what each phase involves going forward. Same, Changed, or New marks what's different from today.
9Continuation, Amendments & Supplemental Funding
Process simple, non-industry continuing awards. Same ownership, pending the responsibility matrix being finalized.
Same
Process complex/industry continuing awards. Contracting-led.
Same
Exchange proposed contract changes with the other party. Tracked inside Issuetrak instead of email, so version history isn't lost.
Changed
10Closeout & Audit
Flag the project for closure.
Same
Reconcile the balance; prepare closeout entries. GL-led.
Same
Complete closeout forms & obtain sign-offs. Post-Award-led.
Same
Track renewal dates & obligations. Tracks automatically instead of by hand-reading PDFs and doing date math.
Changed
Link related agreements for reporting. A lease or vendor deal named in the same proposal is linked instead of siloed.
New
Respond to single/desk audits, if required. GL-led.
Same
Slide 24
The Shift We're Making
Zooming into a single contracting request as it actually moves, today versus tomorrow, once a need for one exists. This cuts across several phases from the map above, most often Phases 1, 4, 6, and 9.
Entry Point
Triage & Routing
Drafting & Internal Review
External Negotiation
Approval & Execution
Post-Execution Tracking
Today
Three uncoordinated inboxes.
Triaged by feel, no documented tiering.
Pre/post-award responsibilities still being worked out.
Proposed changes exchanged by email, no version tracking.
RI doesn't own Adobe Sign; no return notification.
No shared list; obligations tracked by hand.
What Changes
- Retire the personal inbox.
- Split into two shared inboxes, pre-award and post-award, each with a backup owner.
- Adopt a routing rule based on funding source and flow-down status.
- Add a weekly cross-team meeting to set top priorities.
- Publish the responsibility document.
- Move to parallel approvals, for example Finance and Legal together, instead of one after another.
- Move proposed contract changes into Issuetrak instead of email.
- Track versions so nothing gets lost between them.
- Broaden signer access.
- Fix the notification gap when a signed copy returns.
- Centralize storage and build dashboards.
- Link contracts so obligations track automatically.
Future
Two shared inboxes, no personal inbox.
Rule-based routing, weekly priority-setting.
Documented responsibilities, parallel approvals.
Tracked workflow, no lost versions.
Broader access, reliable notification.
Centralized, automatic tracking.
Slide 25
The Tooling Decision Is Already Made, Mostly
Leadership chose Issuetrak in mid-August. The known gaps were deferred, not resolved, and one objection behind that choice turned out to be wrong.
Issuetrak was chosen over two AI-native contract lifecycle systems (Ironclad and LinkSquares) in mid-August 2026. Rationale: the team already knows it. Get the process itself defined and working there first, then see what gaps remain, rather than pick a system before the process is settled.
Real, acknowledged gap, deferred rather than fixed: Issuetrak has no native contract data model, no e-signature, and no AI review. It's a ticket log with a reporting widget attached, not a contract lifecycle management system.
Ironclad and LinkSquares both scored 18 to 20 of 20 core contract-lifecycle capabilities in the same comparison, including native status dashboards and obligation and renewal tracking, the exact gap this whole project exists to close.
The access concern that originally weighed against them was a misunderstanding. The real requirement is IU single sign-on login, not network-level VPN-gating. Both vendors support standard single sign-on, the same protocol IU's identity system already runs on. That objection no longer holds as stated.
Two more tech-stack facts worth knowing: RI doesn't own its own Adobe Sign account, IU does. And Financial Edge is staying exactly as-is on purpose, to avoid stacking another system change on top of the incoming HR system and a recent HR-platform rollout.
Slide 26
Proposed Initiatives (Strawman)
Grouped by what they change: process, technology, or governance, the same three threads from Slide 2. Sizes are a starting guess, not a commitment.
Process
Consolidate IntakeS
Formalize the two shared inboxes and assign a backup person to each. Retire the personal inbox for good.
Screening Timing FixS
Move debarment/suspension screening and the independent-contractor check to pre-award, before submission. Proposed by the post-award team, not yet tested against pre-award's own view.
Pre / Post-Award Handoff DocsS
Finalize and publish the responsibility document already in draft. Consider a monthly audit to catch budgets that go missing in the handoff.
Consolidate Post-Award SOPsS
Post-award SOPs already exist, they're just split across multiple activity-specific documents rather than one. This is a consolidation and organization effort, not a from-scratch write. The first attempt at a single unified doc failed because nobody who owns the work was consulted.
Vendor & Subcontract Scoping in Pre-AwardM
Make vendor and subcontract scoping, including use of the existing vendor assessment tool, a required part of proposal development, not something discovered after award. Currently skipped often enough that Contracting is left scrambling post-award. If workload is the real cause, that's a staffing conversation, not a reason to route around the step.
Investigator EducationM
Train investigators, especially in GHI, on contracting basics, including when a PI is implicitly acting as project manager and what that role owns, and what is and isn't appropriate to "wing it" on with budgets. Pair training with real accountability.
Budget & Invoicing QA StepS
Add a mandatory second-reviewer check in Finance, not just better tools, to catch calculation errors and stale rate/salary data before they reach post-award or a sponsor. The root cause traces to budget-building, not invoicing. Doesn't fix the separate problem of budget work being split across disconnected forms, see the Decisions slide.
Administrative Task Ownership & TrackingM
Not the science itself, that stays with Science. This is the scheduling, documentation, and follow-up work that comes up throughout a project and doesn't have a default owner today, so it falls to whichever Science team member is willing to chase it. Give it a default home across Pre-Award, Post-Award, and Contracting, and track it to completion. Already named as a gap in the future-state design work: assigning tasks and deadlines, not just status, is closer to what a real project-management tool does than what a ticket system is built for.
Technology
Shared Status DashboardM
Give requesters and program staff a live view of where a request stands. The single most-requested fix across the interviews, and already named as a future-state goal, but never scoped as its own initiative until now. Needs a paired owner who keeps it current, or it becomes another stale artifact like today's invoicing workbook.
Ballpark Budget EstimatorS
A low-stakes way to rough out early numbers before the official budget process starts, something investigators have explicitly been told not to do informally today. Both pre-award and post-award raised the same failure mode when this came up before: a copy of an old budget goes stale, and faculty don't always understand the underlying formulas. Finance is already piloting a three-tier version with documented assumptions, so this is lower priority than it might otherwise be, mainly a matter of making sure any self-serve tool stays maintained rather than becoming another stale spreadsheet people ignore.
NDA & Agreement Lookup ListS
An inventory of organization, document type, and expiration date already exists, it was built and tracked previously but never communicated org-wide. This is mainly a publishing and socializing effort, not a new build. Answers "do we already have one" without opening document access org-wide.
Adobe Sign FixesS
Broaden who can run signature requests and close the notification gap when a signed copy returns.
Storage & Source of TruthM
Centralize contract storage, link Financial Edge master agreements to their statements of work by funder, and define who can see what.
Negotiation WorkflowM
Define how proposed contract changes move in and out of Issuetrak, with version tracking, instead of living only in email.
Obligation & Compliance TrackingL
Replace manual date math with structured tracking of renewals, auto-renewal windows, and data-privacy terms.
Governance
Risk-Based Routing & PrioritizationM
Adopt the funding-source routing rule and stand up a recurring weekly meeting to set top priorities across the org.
Reduce the Single-Reviewer BottleneckM
One person reviewing essentially all contracts is a live risk right now, not a hypothetical one. Decide whether a second trained reviewer is temporary coverage or a structural need. Separately, a signing-authority policy already exists in draft, it just needs the procedure finalized and socialized so signing authority isn't concentrated in one person, and so people stop being surprised when that person is out of office.
Turnaround-Time ExpectationsS
Post-award has no defined response-time commitments at all, unlike pre-award's incomplete SLA table. Publish expected turnaround by request type, so silence doesn't read as a problem and questions surface early instead of right before a deadline.
Slide 27
Decisions This Group Actually Needs to Make
- Is the underlying responsibility matrix a final decision or still a working draft? This has come up three separate times independently, in a working session with the post-award team, in pre-award's internal pushback, and in the post-award team lead raising it directly with leadership, without ever being settled.
- Should debarment/suspension screening and the independent-contractor check move to pre-award, before submission? The post-award team believes so. Not yet tested against pre-award's own view.
- Do we revisit the AI-native contract lifecycle options now that the access objection turns out to be a misunderstanding, or stay committed to building the process out in Issuetrak first?
- Who resolves Adobe Sign account ownership with IU, and on what timeline?
- Do Operational contracts (vendor agreements, software licensing, not tied to an award) sit with the current contracting team, or somewhere else? Today staff are only assigned to federal work.
- What's the real distinction between private-funder and industry contracts? It isn't clear to the group itself yet.
- Is a monthly workflow audit worth requiring, to catch pre-award to post-award handoff gaps before they become a problem?
- When an administrative task doesn't clearly belong to Pre-Award, Post-Award, or Contracting, who holds default ownership, so it stops defaulting to whichever Science team member is willing to chase it?
- How do we reconcile the intake form and the separate RDS form so people stop entering the same numbers twice? Fair-market-value budgeting itself is settled, it's correctly owned by Finance, the open piece is just this form duplication.
- How do we enforce vendor and subcontract scoping in pre-award before submission, rather than discovering the gap after award? If volume is the real cause, that points to a staffing decision, not a process workaround.
Slide 28
Rough Sequencing
Pulled from the phased project plan already shared with the group. Dates are targets, not commitments.
Phase 1
Discovery & Review
Complete
Target: 2026-07-31
Phase 2
Process Redesign
In progress
Target: ~2026-08-28
Phase 3
Systems & Technology
Next
Target: ~2026-09-30
Phase 4
Training & Rollout
Upcoming
Target: ~2026-10-31
Phase 5
Post-Implementation
Ongoing
Monthly / annual review cycle
Slide 29
Backlog · Out of Scope
Beyond This Project: OSI & Pre-Pre-Award Gaps
What's genuinely still deferred, in the interplay between OSI and Grants & Contracts. Two related ideas that started here have since been scoped as real initiatives, see the cross-references below. Stabilize this workflow first, then connect the two.
Prior-agreement / NDA lookup. Promoted to an active initiative, see Slide 26 (NDA & Agreement Lookup List).
"Budget playground." Promoted to an active initiative, see Slide 26 (Ballpark Budget Estimator) and Slide 17.
Longer-term idea, still deferred. A fuller ballpark sizing and education resource, parallel to what was done for RDS, so requesters get realistic expectations without a one-off ask every time. Bigger than the scoped estimator above; not part of this phase.
Trigger to revisit. Once this project's workflow phase is stable, reconnect with OSI's leadership, who are building their own proposal-through-award flow, so the two flows get designed together rather than in isolation.
Slide 30
Next Steps
- Confirm this framing with the pre-award and post-award team leads and their managers before it goes wider.
- Trim redundant pain points that repeat across multiple slides.
- Size the initiatives in more detail once the group agrees on the pain-point priorities.
- Fold in the full responsibility matrix once the post-award team's review pass is done.
- Bring a finalized version back as the leadership deck, once the content is solid.
Questions and corrections welcome, in whatever form is easiest for you.